Prologis Park: BREEAM New Construction Outstanding Development
Overview:
Prologis Park Hemel Hempstead, developed by Prologis in partnership with VolkerFitzpatrick, has achieved a BREEAM New Construction ‘Outstanding’ rating. The project demonstrates how ambitious sustainability targets can be successfully embedded into industrial design and construction. SmartWaste supported efficient resource management, contributing to the project’s exemplary environmental performance. The result is a future-ready facility delivering long-term value for the developer, contractor, and occupier.
The case study features insights from Martin Cooper, Development Manager at Prologis UK, David Barnes, Senior Sustainability Manager at VolkerFitzpatrick, Toby Harvell, Sustainability Manager at VolkerFitzpatrick, and Paul Tompson, Group CEO at Aerospheres, reflecting the collaborative effort and shared expertise that contributed to the success of the project.
- Prologis UK – Developer
- VolkerFitzpatrick – Contractor
- Aerospheres – Occupier
Browse more from our latest case studies:
The Chancery Rosewood hotel achieves BREEAM Outstanding for former United States Embassy transformation
The Peninsula London. Built to endure. Engineered to perform.
Space House achieves BREEAM Outstanding for Grade II listed Brutalist building
Prologis Park: BREEAM New Construction Outstanding Development
BREEAM Infrastructure: Hove Hensetting rail stabling excellence
BREEAM Infrastructure: 10 Dock Facility submarine dockyard excellence
2 Auriol Drive Refurbishment Sets New BREEAM Standards