Drone Photo of new jetty at Thanckes Oil Fuel Depot

Thanckes Oil Fuel Depot Loading Facility & Tank Farm Fire Fighting Upgrade

Drone Photo of new jetty at Thanckes Oil Fuel Depot BRE Group

CEEQUAL Good – Whole Team Award

Version 5, 2023 | Kent, UK

Assessor: Julien Diaz, VolkerStevin
Verifier: Karl Pitman, Pitman Associates Ltd
Client: Defence Infrastructure Organisation
Designer: CH2M
Constructor:
VolkerStevin

Project Summary

DIO awarded a contract worth approximately £43 million to VolkerStevin to construct a new jetty at Thanckes Oil Fuel Depot which provides fuelling facilities for the Royal Navy at Devonport Naval Base.

The project delivers a new jetty with fuel loading and firefighting facilities.

The completed facility services all the Navy fuelling requirements at Devonport.

 

Jetty - sustainable infrastructure

Metrics

Waste diverted from landfill N/A tonnes or m3 100 % of total inert waste
94.60% of total non-hazardous waste

Financial Benefits

In your view, has CEEQUAL represented value for money?

The main goal of the assessment was not to represent value for money but to drive the project to reach higher sustainability, environmental and social standards. The financial impact of the assessment was therefore not measured.

Achievements

Water Environment

The project was specifically good at protecting the water environment during construction and operation

People and communities

The project team was eager to improve the image of the construction industry by taking part in local life and engaging with the community.

– AECOM created a partnership link with the “Friends of Thanckes Park Team” and lent/transported pinecones from site for a community event taking place in Thanckes Park in February.

– VolkerStevin organised for refurbishment works to be carried out at St Columba & Torpoint RFC. In exchange, the RFC kindly shared 25 parking spaces with the project.

 

Cumbrian Fisher 2

Further Information

What were the main challenges for the project and how were these overcome?

The new jetty was built within a Special Area of Conservation, on the River Tamar, and the project had to comply with complex environmental constraints.

The project’s nature and location imposed demanding design and planning constraints, coupled with specific requirements regarding its visual impact and specifications.

The works also had to be carried out whilst the old jetty was still operational as the fuel depot activities could not be suspended during the construction phase.

All these challenges were tackled by using advanced planning methods and team work.

What were the drivers and perceived benefits for undertaking a CEEQUAL assessment on this project?

Improved design, better community involvement, more innovative approach to transport (Most material was imported by barge to limit impact)

How did the use of CEEQUAL influence the outcomes of the project? What was done differently because of the CEEQUAL process?

A particular stress was placed on the social impact of the project and the involvement of the site team in local life. Landscape and water protection were influenced by CEEQUAL which also fuelled a strong desire to constantly innovate at concept, design, and construction stage.

What elements of this project highlight best practice and innovation?

Land and landscape, water protection, project management and transport.

 

Jetty Nightime

BREEAM Infrastructure insights and case studies

Browse the latest insights, thinking and case studies from BREEAM Infrastructure

 

Lillestrøm pumping station BRE Group

Pumpestasjon PA240 – Lillestrøm Kommune

Construction of a new pumping station infrastructure in the municipality of Lillestrøm. The project has great social significance in terms ...
Read More
Westside Metro Extension Phase One BRE Group

Birmingham Westside Metro – Centenary Square Extension

The Midland Metro Alliance (MMA) is working on behalf of Transport for West Midlands (TfWM), which is part of the ...
Read More
Musaimeer Pump Station and Outfall Qatar BRE Group

Musaimeer Pumping Station and Outfall Tunnel

Musaimeer Pump Station and Outfall (MPSO) is one of the unique infrastructure projects of Ashghal which aims to provide a ...
Read More
Bybanen D12 Store Lungegårdsvann BRE Group

Bybanen D12 Fløen – Kronstad

The Bybanen tram-project is part of the Miljøløftet, a common term for the urban growth agreement and the city infrastructure ...
Read More
DCIM100MEDIADJI 0115JPG BRE Group

A6 Randalstown to Castledawson Dualling

Delivered by the Department for Infrastructure the A6 Dualling Scheme upgrades 14.7 kilometres of Transport Corridor between Randalstown and Castledawson, ...
Read More
8Landscaping And Biodiversity Protection Under Hydal Bridge©Nye Veier BRE Group

E18 Rugtvedt – Dørdal

The project is a 16.5km four-lane motorway in Telemark, Norway with a 110 km/hour speed limit. The state-owned company, Nye ...
Read More

Get in touch

Contact us now or call us on +443330147880 if you would like to talk to our team about how BREEAM Infrastructure can support you.