Prefabricated housing in the UK. A case study: Murray Grove, Hackney (Downloadable version)
THIS PUBLICATION HAS BEEN ARCHIVED.
Whilst this publication can still be purchased some of the information in it has been superseded by more recent research and standards. The BRE Group does not accept any responsibility whatsoever for any loss or damage, including - without limitation - indirect or consequential loss or damage arising from use, or loss of use, of data or profits arising out of, or in connection with, the use of this document.
This Information Paper results from an industry-led project sponsored by DETR on innovation and best practice in flexible and modular residential construction. The Information Paper is in three parts: Parts 1 and 2 describe two case studies and Part 3 summarises the project. The main objective was to study modular construction in the context of flexible, adaptable and sustainable solutions to the changing demands of social housing and unpredictable future demographic demands. The case study in this part is Peabody Trust’s prefabricated housing development Murray Grove in Hackney. The development was completed in November 1999.