Breadcrumb
Product Details
Book Badged Archived

Building in winterPDF DOWNLOAD

Publisher
BRE Electronic Publications
Author
BRE
Format
Subject / Keyword
Good Building Guide 34, GBG34, GG34
Published Date
01-Oct-1999
ISBN
1860813275

THIS PUBLICATION HAS BEEN ARCHIVED.

Whilst this publication can still be purchased some of the information in it has been superseded by more recent research and standards. The BRE Group does not accept any responsibility whatsoever for any loss or damage, including - without limitation - indirect or consequential loss or damage arising from use, or loss of use, of data or profits arising out of, or in connection with, the use of this document.

Winter weather often makes it difficult for builders to get on with the job. In very severe winters, sites can be at a standstill for weeks on end. Even in less severe weather, building operations are more difficult and working hours are bound to be reduced. Frost, rain and high winds can also play havoc with newly built work unless proper precautions are taken. Some of these problems can be reduced by advance planning, good preparation of the site, care of stored materials and protection of completed work. This Guide gives some tips and advice from BRE on how to keep interruptions to building to a minimum during winter weather, how to protect materials, and when it is vital to stop work. 6 pages.
Book Badged Archived

Building in winterPDF DOWNLOAD

List Price £ 9.00
Product Publisher