Bygrave Anaerobic Digestion Plant | CEEQUAL

Bygrave Anaerobic Digestion Plant

The £12m anaerobic digestion (AD) plant at Bygrave Lodge Farm, near Baldock in Hertfordshire was developed as part of Biogen’s strategy to build a network of green energy plants across the UK.

Greenwich Millennium Village: Parcel 3 | CEEQUAL

Greenwich Millennium Village: Parcel 3

GMV is an exemplar project, which encapsulates the Government’s commitment to sustainable development and the creation of sustainable communities. The CEEQUAL assessment covers Phases 3, 4 & 5 of the GMV development, with Phases 1 & 2 having already been constructed.

Highway E4, Rotebro | CEEQUAL

Highway E4, Rotebro

The Swedish Transport Administration needed to replace two bridges on the E4 highway, at one of Sweden’s busiest junctions – Rotebro – as the technical lifespan of the bridges had been reached.

Ordsall Chord | CEEQUAL

Ordsall Chord

The project consisted of the construction and operation of a new 340m two-track line which crosses the River Irwell and the Manchester Inner Ring Road (IRR-Trinity Way).

Forth Replacement Crossing: Queensferry Bridge – Principal Contract

The Forth Replacement Crossing (FRC) is the project behind the Queensferry Crossing, the new road bridge connecting both sides of the Firth of Forth. By adding to the Forth Bridge and the Forth Road Bridge, Transport Scotland has safeguarded one of the most vital connections in Scotland’s transport network. The Queensferry Crossing opened to traffic on 30 August 2017.

A30 Temple to Higher Carblake | CEEQUAL

A30 Temple to Higher Carblake

The A30 Temple to Higher Carblake Improvement is a ÂŁ60 million highway improvement scheme part funded by Cornwall Council and the Department for Transport.

New Low Level Waste Facility

The project involved the Design and Build of two sub-surface vaults for the disposal of solid low-level radioactive waste from the Dounreay facility. This development is an essential part of the infrastructure needed to complete the decommissioning and closure of the former nuclear research site.

Olympic Park: Media Hub Multi-Storey Car Park | CEEQUAL

Olympic Park: Media Hub Multi-Storey Car Park (MSCP)

The design and construction process responded to the high standards for sustainability set out by the Olympic Delivery Authority, achieving an Excellent Rating under CEEQUAL Version 4 and with a ratified score of 93.3%.