Design for Deconstruction Case Study 5: Office building
This is the fifth and final in a series of case studies that use a new methodology to assess the deconstruction potential of new build properties. The case studies and methodology have been funded by the BRE Trust to raise awareness amongst architects, designers and contractors of the potential of Design for Deconstruction (DfD) to … Continue reading “Design for Deconstruction Case Study 5: Office building”