Stockholm Extended Metro Arenastaden Plattform | CEEQUAL

Stockholm Extended Metro – Arenastaden

The extension of the Stockholm Metro is vital to make Stockholm a vibrant and accessible city with a sustainable public transportation network. The Arenastaden project includes the extension of the Metro from Odenplan to Arenastaden in Solna.

Crossrail Surface Works: Stations West (Phase 1) | CEEQUAL

Crossrail Surface Works: Stations West (Phase 1)

The Crossrail West Stations Project received a CEEQUAL Excellent Whole Team Award due to the commitment of the project to implement sustainability throughout the project. Various social and environmental initiatives with economic benefits were undertaken.

Stockholm Extended Metro: Nacka/Södermalm/Söderort

The Stockholm Metro extension is a sustainable transport project that expands the public transport opportunities within the region. The project increases the resilience of the region’s transport system by relieving the existing system and offering new itineraries.

Crossrail: Eleanor Street & Mile End Road Shafts

Crossrail is delivering the Elizabeth line – a new railway for London and the South East. When it opens through central London from December 2018, it will transform travel in London.

Crossrail: Whitechapel and Liverpool Street SCL | CEEQUAL

Crossrail: Whitechapel and Liverpool Street SCL

Crossrail C510 Whitechapel and Liverpool Street Station Tunnels is a major tunnelling contract awarded as part of Crossrail, Europe’s largest infrastructure project.

Paddington Bakerloo Line Link

The complex £40 million Bakerloo Line Link project provides a new 170m pedestrian tunnel link between the Paddington Crossrail Station and London Underground Bakerloo Line platforms.

Hitchin Grade Separation | CEEQUAL

Hitchin Grade Separation

This project was conceived by Network Rail over 15 years ago to improve timetables on the East Coast Main Line (ECML) where the Cambridge line traffic crossed the ECML on a flat crossing.

Ordsall Chord | CEEQUAL

Ordsall Chord

The project consisted of the construction and operation of a new 340m two-track line which crosses the River Irwell and the Manchester Inner Ring Road (IRR-Trinity Way).