Airports and PortsHere are the latest CEEQUAL case studies for airports and ports.
Click on the links below to find out more.
Here are the latest CEEQUAL case studies for airports and ports.
Click on the links below to find out more.
Thanckes Oil Fuel Depot Loading Facility & Tank Farm Fire Fighting Upgrade
VolkerStevin constructs a new jetty at Thanckes Oil Fuel Depot to provide fuelling facilities for the Royal Navy at Devonport Naval Base.
Dover Western Docks Revival (DWDR) – Port of Dover
Dover Western Docks Revival (DWDR) is a one-off opportunity for the regeneration of Dover, bringing new investment into the area. The CEEQUAL assessment provided a management tool for the project team to conduct an overall review on the sustainability of the project.
Utvecklingsprogram Arlanda – Nytt Driftområde (Arlanda airport dev program)
Stockholm Arlanda airport keeps growing with an increasing number of passengers (approximately 6 million more travellers today than 2010) and therefore the airport is expanding its capacity.
Mosjøen Harbor Remediation
Mosjøen Harbor Remediation includes dredging of contaminated sediment and placement of this sediment in steel sheetpile cells (CDF) for an extension to an existing wharf.
Project Anvil Main Works: New and Refurbishment Airfield Works, RAF Marham, Norfolk
Project Anvil is a Ministry of Defence major infrastructure investment project to improve existing facilities at RAF Marham station for the arrival of the F35 Lightning, an advanced 5th generation stealth aircraft.
RAF Lossiemouth – AOS Project
The project is a full refurbishment of all major airside pavement surfaces at RAF Lossiemouth for a new Boeing P8 fleet, Typhoon Quick Reaction Alert (QRA) and normal operations.