Worcestershire Sustainable Infrastructure

Worcestershire Parkway Regional Interchange

Worcestershire Sustainable Infrastructure

CEEQUAL Very Good – Whole Team Award


Version 5, October 2022 | Worcestershire, UK

Client: Worcestershire Council Council
Designer: Mott MacDonald
Constructor: Buckingham Group Contracting Ltd
Assessors: Nathan Godley, SLC Rail
Katie Dixon, Mott MacDonald
Verifier: Gemma Fenn, Fenn Environmental

Project summary

Worcestershire Parkway is a new station at the intersection of the Worcester to London (OWW line) and Birmingham to Bristol lines (BAG lines) at Norton, 3.5 miles east of Worcester city centre. The location of the station offers direct passenger access to both aforementioned lines unlike the other stations currently in Worcester.

The station accommodates for the increase in demand  for  rail  services  to  and  from Worcestershire  and  contributes  to  the  growth  of  the  local  economy  by  improving access  to  the  rail  network  and  reducing  car  based  rail-heading  to  other stations such as Birmingham International, Cheltenham and Warwick Parkway.

BREEAM Infrastructure Worcestershire Parkway

Station benefits

  • Support  for the  local economy  of  Worcestershire  and  the  wider  region  in  line  with LEP Strategic Economic Plan which aims to create 27,000 new jobs in the area   to   boost   the   local   economy   and   the   South   Worcestershire Development Plan which proposes 28,000 new homes being built in South Worcestershire, much of it in close proximity to the new station.
  • A step change in direct rail access to people in Worcestershire and wider south Midlands area to the strategic rail network both north south and to/from London and South East.
  • Improved  access  to  rail  in  order  to  complement  the  improvements  and maximise the benefits offered by IEP trains.
  • Unlock  the  current suppressed  demand,  which  exists  as  a  result  of limitations  to  current  rail  services  and  poor  access  opportunities  for  car users due to lack of parking spaces at stations.
  • Encourage  sustainable  travel  and  contribute  to  environmental  objectives through  promoting  modal  shift  to  rail  and  consequently  reducing  car dependency.
  • Reduce car usage on the Strategic Highway network by 6m kilometres per annum by 2031 .

 

Achievments

People and Communities

The engagement with all stakeholders from local residents to disabilities user groups to local schools and the rail industry as a whole. Collaboration was clear and evidenced throughout and those involved both during delivery and after as users have a real sense of pride of the station and it’s facilities.

Ecology and biodiversity

The net gain in bidoversity and protection of local ecology during and post delivery is seen as a major success.

Water environment

Local (and wider) flood management improvements as a result of the introduction of active and sustainable drainage.

Physical resources use and management

The reuse of virtually all of the site material by means of lime stabilistation treatment, the use of reclaimed oil pipes for foundations, efficient management / reduction of site waste.

Further Information

What were the main challenges for the project and how were these overcome? 

Existing Materials – the existing site material was not suitable to build directly on or use as construction material therefore, it was treated using lime stabilisation. This reduced the requirement to export/import new materials.

Reptile migration – the existing site had a rich habitat including reptiles which required management throughout the works. This was undertaken using Environmental Specialists to survey, monitor and migrate the reptiles as the site construction works progressed.

Biodiversity – it was the aspiration of the scheme from the outset to avoid as far as possible disruption to and reduction of the biodiversity of the site. As a result of rigorous monitoring and implementation of sympathetic landscaping, the site has seen a net gain in the biodiverse environment.

Sustainability – it was key that sustainability was at the heart of delivering Worcestershire Parkway. This was monitored and managed through all stages, particularly in delivery where HSQE experts were engaged to ensure adherence to site waste management plans, consents and permits relating to local water courses, protection of the local environs from contamination and existing habitat management. One specific example relates to the use of reclaimed and treated oil pipes as the steel pile foundations across the site.

Local transport infrastructure – the creation of a new roundabout to offer access to the station improved the local road environment by assisting traffic flow and reducing speeds.

Flood Management – the site was in a high risk flood areas and the introduction of active and managed drainage has not only delivered what was required to manage the station and car park facilities, but has also improved the water management more widely resulting in prevention of flooding to historically poor areas.

What were the drivers and perceived benefits for undertaking a CEEQUAL assessment on this project?

Key motives for the CEEQUAL Assessment related predominantly to improved public relations and greater focus on the local environment namely ensuring the least possible disruption to the biodiversity of the existing site and its surrounds.

Worcestershire Parkway new station BREEAM Infrastructure

How did the use of CEEQUAL influence the outcomes of the project? 

Undertaking the CEEQUAL Assessment and providing evidences against the criteria challenged the projects thinking in a variety of ways including; how to demonstrate that processes and procedures already in place to manage (for example) site waste are forward thinking and innovative. It also served to demonstrate that in delivering rail projects, the systems in place are well thought through and robust in their support of managing the delivery of the scheme, protection of the local environment, the most efficient use of resources, the local water environment and the people and local communities.

What elements of this project highlight best practice and innovation?

Retained and enhanced biodiversity, site waste management efficiency, reduced import and export of site materials, reuse of reclaimed oil pipes for piled foundations, flood risk management and sustainable drainage improving the local and wider flood environment, stakeholder engagement and involvement, community engagement and support.

BREEAM Infrastructure (formerly CEEQUAL) Case Studies

Browse the latest case studies from BREEAM Infrastructure

 

Eastern Bay Link

Eastern Bay Link

The Eastern Bay Link scheme extends the A4232 link road, situated south of Cardiff, reducing the current journey by 2.5 ...
Foryd Harbour Public Realm

Foryd Harbour Public Realm

The Rhyl Harbour project formed part of a stream that included a sustainable transport bridge, coastal erosion and flood protection ...
Crossrail: Connaught Tunnel and Surface Railway | CEEQUAL
| CEEQUAL Case Studies, Rail, UK

Crossrail: Connaught Tunnel and Surface Railway

The Connaught Tunnel Refurbishment Project transformed an abandoned 1878 Victorian tunnel and disused railway and re-engineered it to receive the ...
Colwyn Bay: Phase 1 – Flood Defence | CEEQUAL

Colwyn Bay: Phase 1 – Flood Defence

The coastal defences along the Colwyn Bay frontage had several key issues to address through developments and improvements. As a ...
Bulford Road Improvement Scheme | CEEQUAL

Bulford Road Improvement Scheme

The Bulford Road Improvement project was conceived and designed to provide significant improvements to a single lane road between the ...
Baltic Triangle Public Realm Improvements

Baltic Triangle Public Realm Improvements

The Baltic Triangle scheme was formulated to implement improvements to the public realm in the creative industries location of the ...

Get in touch

Contact us now or call us on +443330147880 if you would like to talk to our team about how BREEAM Infrastructure can support you.