CEEQUAL Excellent (90.9%) – Whole Team Award
Version 5, November 2018 | Sweden

ClientSwedavia Airports
DesignerTengbom (Architect), Ramböll (Design)
ContractorJM Entreprenad
Assessors: Martin Ljungström (Sweco)

Utvecklingsprogram Arlanda – Nytt Driftområde (Arlanda airport dev program) | CEEQUAL

Project Summary

Stockholm Arlanda airport keeps growing with an increasing number of passengers (approximately 6 million more travelers today than 2010) and therefore the airport is expanding its capacity. Part of the airports capacity expansion is a new maintenance area. The area consists of workshops, security control, garage, staff buildings and offices for the organization that maintains the airport, which varies from cleaning the landing strips from snow to maintaining gardens and green fields at the airport. The new maintenance area has a landscaping area of approximately 150,000 m2 and 14 buildings with a total floor area of about 50,000 m2.

Utvecklingsprogram Arlanda – Nytt Driftområde (Arlanda airport dev program) | CEEQUAL

Sustainability Aims

The purpose of the project has been to offer a sustainable and functional product for the various work units for the airport maintenance activities. There’s been an aim to raise awareness of the environmental impact caused during the life cycle of the project and, as far as feasible either mitigate or reduce these impacts. The client, Swedavia, designs and develops many new buildings at the airport. Swedavia has a comprehensive environmental policy with far reaching goals. For instance, Swedavia has the goal of having no carbon dioxide emissions from fossil fuels and to reduce the energy consumption of the airport by 2020.

Utvecklingsprogram Arlanda – Nytt Driftområde (Arlanda airport dev program) | CEEQUAL

Challenges and Achievements

The sustainable objectives were many. To mention a few examples, the project had a goal to replace the ecological values removed for new buildings and hard surfaces. The trees cut down at the site were transported to a nearby forest in the airport area and used as fauna depot. The operation area has a lot of paved surfaces for vehicle movements, and several large buildings, which leads to disadvantages such as increased storm water runoff and poor biodiversity. The project has therefore adopted the green roof concept (mats of sedum and moss) for all major buildings, resulting in reduced storm water runoff, and increased biodiversity.

All building walls are made of cross-laminated wood and the facade is also made of wood. This reduces the carbon dioxide emissions from the production compared with traditional concrete walls. All new buildings have energy performance far below Swedish general recommendations (25 to 50% better). LED-lighting is used outside and inside the buildings. The vehicle wash on the Operations area recycles the wash water and therefore uses ¼ of the water compared to a traditional vehicle wash.

All construction vehicles have used bio diesel during the construction to reduce the global warming impact. During construction, cuts and fill balance have been almost achieved, and most of the small surplus has been reused in another project on the airport.

Utvecklingsprogram Arlanda – Nytt Driftområde (Arlanda airport dev program) | CEEQUAL

How did CEEQUAL influence your project?

The client, the designer and the constructor have worked together to achieve far reaching sustainability goals and all parties have contributed with ideas and activities. The result is a development that has significantly lower negative environmental and social impact than would have been the case without the CEEQUAL-certification. The Whole Team Award approach contributed to useful lessons learned for future projects for all involved parties. CEEQUAL has contributed so that the project has gained a holistic approach to sustainability.

Utvecklingsprogram Arlanda – Nytt Driftområde (Arlanda airport dev program) | CEEQUAL

Utvecklingsprogram Arlanda – Nytt Driftområde (Arlanda airport dev program) | CEEQUAL

Acknowledgments

The CEEQUAL team consisted of the following:

  • Martin Enquist, Project Manager, Owner – Swedavia
  • Anders Moberg, Environmental Coordinator, Owner – Swedavia/PE
  • Maggie Youseff, Environmental Coordinator, Construction – JM
  • Savvas Misikoglou, Environmental Coordinator, Construction – JM
  • Martin Ljungström, Lead CEEQUAL Assessor, Sweco
  • Madelene Ulmestig, Assisting CEEQUAL Assessor, Sweco
  • Anna Fält, Assisting CEEQUAL Assessor, JM/Ramböll
  • Sarah Adler, CEEQUAL Administrator, Sweco
Utvecklingsprogram Arlanda – Nytt Driftområde (Arlanda airport dev program) | CEEQUAL
Arlanda Airport Director Peder Grunditz is presented on behalf of the project Team their Excellent CEEQUAL Award by CEEQUAL Assessor Martin Ljungström, Sweco.

CEEQUAL insights and case studies

Browse the latest insights, thinking and case studies from CEEQUAL

 

7 Black Cart Cycleway Bridge - Installed

Glasgow Airport Investment Area Leads in Sustainable Infrastructure Innovation

The Glasgow Airport Investment Area (GAIA) project creates the connections and sustainable infrastructure of Scotland's manufacturing innovation district ...
Tullgarnsbron E01 Sustainable Infrastructure BREEAM

Tullgarnsbron E01 Bridge Sustainability Assessment

CEEQUAL (now known as BREEAM Infrastructure) sustainability assessment for new bridge being built over the Fyris river, an extension of ...
Sea filling winter conditions

E16 Kvamskleiva

E16 Kvamskleiva was mainly a rock slide protection project in an area with steep mountain sides and frequent ice and ...
Flomsikring-Mjøndalen-sentrum-Vassenga BREEAM Infrastructure

Flomsikring Mjøndalen sentrum – Vassenga

Flomsikring Mjøndalen - Vassenga is part of the flood defence project in Mjøndalen, aiming to reduce the flood risk in ...
Norway’s highest bridge, in Audnadalen, planned nicely to fit in the landscape. Artist: Wichada Treepoonpon, Sweco Norge.

E39 Mandal – Lyngdal øst

Nye Veier AS have, in collaboration with Sweco Norge AS, planned a new four-lane motorway from Mandal River through Lindesnes ...

Get in touch

Contact us now or call us on +443330147880 if you would like to talk to our team about how CEEQUAL can support you.