Drone Photo of new jetty at Thanckes Oil Fuel Depot

Thanckes Oil Fuel Depot Loading Facility & Tank Farm Fire Fighting Upgrade

Drone Photo of new jetty at Thanckes Oil Fuel Depot

CEEQUAL Good – Whole Team Award

Version 5, 2023 | Kent, UK

Assessor: Julien Diaz, VolkerStevin
Verifier: Karl Pitman, Pitman Associates Ltd
Client: Defence Infrastructure Organisation
Designer: CH2M
Constructor:
VolkerStevin

Project Summary

DIO awarded a contract worth approximately £43 million to VolkerStevin to construct a new jetty at Thanckes Oil Fuel Depot which provides fuelling facilities for the Royal Navy at Devonport Naval Base.

The project delivers a new jetty with fuel loading and firefighting facilities.

The completed facility services all the Navy fuelling requirements at Devonport.

 

Jetty - sustainable infrastructure

Metrics

Waste diverted from landfill N/A tonnes or m3 100 % of total inert waste
94.60% of total non-hazardous waste

Financial Benefits

In your view, has CEEQUAL represented value for money?

The main goal of the assessment was not to represent value for money but to drive the project to reach higher sustainability, environmental and social standards. The financial impact of the assessment was therefore not measured.

Achievements

Water Environment

The project was specifically good at protecting the water environment during construction and operation

People and communities

The project team was eager to improve the image of the construction industry by taking part in local life and engaging with the community.

– AECOM created a partnership link with the “Friends of Thanckes Park Team” and lent/transported pinecones from site for a community event taking place in Thanckes Park in February.

– VolkerStevin organised for refurbishment works to be carried out at St Columba & Torpoint RFC. In exchange, the RFC kindly shared 25 parking spaces with the project.

 

Cumbrian Fisher 2

Further Information

What were the main challenges for the project and how were these overcome?

The new jetty was built within a Special Area of Conservation, on the River Tamar, and the project had to comply with complex environmental constraints.

The project’s nature and location imposed demanding design and planning constraints, coupled with specific requirements regarding its visual impact and specifications.

The works also had to be carried out whilst the old jetty was still operational as the fuel depot activities could not be suspended during the construction phase.

All these challenges were tackled by using advanced planning methods and team work.

What were the drivers and perceived benefits for undertaking a CEEQUAL assessment on this project?

Improved design, better community involvement, more innovative approach to transport (Most material was imported by barge to limit impact)

How did the use of CEEQUAL influence the outcomes of the project? What was done differently because of the CEEQUAL process?

A particular stress was placed on the social impact of the project and the involvement of the site team in local life. Landscape and water protection were influenced by CEEQUAL which also fuelled a strong desire to constantly innovate at concept, design, and construction stage.

What elements of this project highlight best practice and innovation?

Land and landscape, water protection, project management and transport.

 

Jetty Nightime

BREEAM Infrastructure insights and case studies

Browse the latest insights, thinking and case studies from BREEAM Infrastructure

 

St Austell Bay Resilient Regeneration (StARR) Project
| CEEQUAL Case Studies, Flood Alleviation, UK

St Austell Bay Resilient Regeneration (StARR) Project

The St Austell Bay Resilient Regeneration (StARR) project is a combination of urban and upstream interventions, which aims to reduce ...
Project Anvil Main Works: New and Refurbishment Airfield Works, RAF Marham, Norfolk

Project Anvil Main Works: New and Refurbishment Airfield Works, RAF Marham, Norfolk

Project Anvil is a Ministry of Defence major infrastructure investment project to improve existing facilities at RAF Marham station for ...
Crossrail Surface Works: Stations West (Phase 1) | CEEQUAL
| CEEQUAL Case Studies, Rail, UK

Crossrail Surface Works: Stations West (Phase 1)

The Crossrail West Stations Project received a CEEQUAL Excellent Whole Team Award due to the commitment of the project to ...
Stockholm Extended Metro: Nacka/Södermalm/Söderort
| CEEQUAL Case Studies, Rail, Scandinavia

Stockholm Extended Metro: Nacka/Södermalm/Söderort

The Stockholm Metro extension is a sustainable transport project that expands the public transport opportunities within the region. The project ...
Scottish Trunk Road Network – North West Unit

Scottish Trunk Road Network – North West Unit

The following work types were considered in detail during the 2018/19 CEEQUAL assessment in the North West Unit: Roads Planned ...
Scottish Trunk Road Network – North East Unit | CEEQUAL

Scottish Trunk Road Network – North East Unit

In 2016 BEAR Scotland committed to commence the CEEQUAL process, pursuing a Whole Team award in conjunction with Transport Scotland ...

Get in touch

Contact us now or call us on +443330147880 if you would like to talk to our team about how BREEAM Infrastructure can support you.