River Lagan Dredging Works

River Lagan Dredging Works | CEEQUAL

CEEQUAL Very Good – Whole Team Award
Version 4, Aug 2012 | Belfast, Northern Ireland

ClientDepartment of Social Development
DesignerDoran Consulting
ConstructionGraham Construction
Assessor: Dion Williams

Project Summary

The site of the dredging works was the River Lagan which flows through the middle of Belfast. The dredging works were carried out on the impounded stretch of the River between the Stranmillis Weir and Lagan Weir. The Client was the Department for Social Development (DSD) who have a statutory obligation to maintain a minimum navigable depth of 1.5m throughout the impounded River Lagan.

A comprehensive dredging scheme was undertaken in 1994 which involved dredging of the impounded river and establishment of an incised channel. The dredging project in 2010/2011 was therefore considered a maintenance dredging of the river that involved reinstatement of the 1994 incised channel. All dredged material from the site was disposed of at an off shore disposal site in accordance with a NIEA license.

Doran Consulting were the designers for the project and the contractor was Graham Construction Ltd. As the project related to a maintenance dredging of a river bed with no impact on the river banks there was substantial scoping out particularly in relation to Sections on Land Use, Landscape Issues, Ecology, Historic Environment and Energy and Carbon.

The CEEQUAL Assessment scored highly in Sections 6 and 8-12. For example Section 6 Water Resources and the Water Environment scored 90% with high scoring for protection of the water environment through monitoring of Oxygen levels and prevention of any fuel discharge. Section 10 Transport scored 91% as traffic impact was minimal due to the decision early on to dispose of dredged material at sea through the use of barges.

River Lagan Dredging Works | CEEQUAL
Machinery for the project lifted into place
River Lagan Dredging Works | CEEQUAL
Site visit 14 October 2010
River Lagan Dredging Works | CEEQUAL
Site visit 1 November 2010

CEEQUAL insights and case studies

Browse the latest insights, thinking and case studies from CEEQUAL

 

A6 Randalstown to Castledawson Dualling

A6 Randalstown to Castledawson Dualling

Delivered by the Department for Infrastructure the A6 Dualling Scheme upgrades 14.7 kilometres of Transport Corridor between Randalstown and Castledawson, ...
E18 Rugtvedt Dørdal | CEEQUAL

E18 Rugtvedt – Dørdal

The project is a 16.5km four-lane motorway in Telemark, Norway with a 110 km/hour speed limit. The state-owned company, Nye ...
Lahti Southern Ring Road (Vt12), VALTARI alliance

Lahti Southern Ring Road (Vt12), VALTARI alliance

This project, undertaken by the VALTARI alliance, involves the construction of a 4.5km southern ring road, bypassing the center of ...
RAF Lossiemouth | CEEQUAL

RAF Lossiemouth – AOS Project

The project is a full refurbishment of all major airside pavement surfaces at RAF Lossiemouth for a new Boeing P8 ...
Stockholm Extended Metro Arenastaden Plattform | CEEQUAL
| CEEQUAL Case Studies, Rail, Scandinavia

Stockholm Extended Metro – Arenastaden

The extension of the Stockholm Metro is vital to make Stockholm a vibrant and accessible city with a sustainable public ...

Get in touch

Contact us now or call us on +443330147880 if you would like to talk to our team about how CEEQUAL can support you.

Tags