CEEQUAL Very Good – Whole Team Award
Version 4, Aug 2012 | Belfast, Northern Ireland

ClientDepartment of Social Development
DesignerDoran Consulting
ConstructionGraham Construction
Assessor: Dion Williams

Project Summary

The site of the dredging works was the River Lagan which flows through the middle of Belfast. The dredging works were carried out on the impounded stretch of the River between the Stranmillis Weir and Lagan Weir. The Client was the Department for Social Development (DSD) who have a statutory obligation to maintain a minimum navigable depth of 1.5m throughout the impounded River Lagan.

A comprehensive dredging scheme was undertaken in 1994 which involved dredging of the impounded river and establishment of an incised channel. The dredging project in 2010/2011 was therefore considered a maintenance dredging of the river that involved reinstatement of the 1994 incised channel. All dredged material from the site was disposed of at an off shore disposal site in accordance with a NIEA license.

Doran Consulting were the designers for the project and the contractor was Graham Construction Ltd. As the project related to a maintenance dredging of a river bed with no impact on the river banks there was substantial scoping out particularly in relation to Sections on Land Use, Landscape Issues, Ecology, Historic Environment and Energy and Carbon.

The CEEQUAL Assessment scored highly in Sections 6 and 8-12. For example Section 6 Water Resources and the Water Environment scored 90% with high scoring for protection of the water environment through monitoring of Oxygen levels and prevention of any fuel discharge. Section 10 Transport scored 91% as traffic impact was minimal due to the decision early on to dispose of dredged material at sea through the use of barges.

River Lagan Dredging Works | CEEQUAL
Machinery for the project lifted into place
River Lagan Dredging Works | CEEQUAL
Site visit 14 October 2010
River Lagan Dredging Works | CEEQUAL
Site visit 1 November 2010

CEEQUAL insights and case studies

Browse the latest insights, thinking and case studies from CEEQUAL

 

Stockholm Extended Metro Arenastaden Plattform | CEEQUAL
| CEEQUAL Case Studies, Rail, Scandinavia

Stockholm Extended Metro – Arenastaden

The extension of the Stockholm Metro is vital to make Stockholm a vibrant and accessible city with a sustainable public ...
Read More
Old Colwyn Coastal Defence and Active Travel Scheme | CEEQUAL

Old Colwyn Coastal Defence and Active Travel Scheme

The scheme represented an opportunity to build on the success of previous phases of the Colwyn Bay Waterfront Project with ...
Read More
Viking Link Bicker Fen Access Road | CEEQUAL

Viking Link (Bicker Fen) Access Road

The Viking Link team used CEEQUAL to deliver a sustainability-driven project. They achieved a 30% reduction in kgCO2 equivalent of ...
Read More
Strule SEC – Site Preparation Works
| CEEQUAL Case Studies, Remediation works, UK

Strule SEC – Site Preparation Works

The purpose of the project was to redevelop the former army barracks at Lisanelly and St Lucia and to provide ...
Read More
Expo 2020 Dubai

Expo 2020 Dubai

Expo 2020 Dubai aims to be one of the most sustainable World Expos in history. For its permanent infrastructure assets, ...
Read More
St Austell Bay Resilient Regeneration (StARR) Project
| CEEQUAL Case Studies, Flood Alleviation, UK

St Austell Bay Resilient Regeneration (StARR) Project

The St Austell Bay Resilient Regeneration (StARR) project is a combination of urban and upstream interventions, which aims to reduce ...
Read More

Get in touch

Contact us now or call us on +443330147880 if you would like to talk to our team about how CEEQUAL can support you.

Tags