Project Summary

The site of the dredging works was the River Lagan which flows through the middle of Belfast. The dredging works were carried out on the impounded stretch of the River between the Stranmillis Weir and Lagan Weir. The Client was the Department for Social Development (DSD) who have a statutory obligation to maintain a minimum navigable depth of 1.5m throughout the impounded River Lagan.

A comprehensive dredging scheme was undertaken in 1994 which involved dredging of the impounded river and establishment of an incised channel. The dredging project in 2010/2011 was therefore considered a maintenance dredging of the river that involved reinstatement of the 1994 incised channel. All dredged material from the site was disposed of at an off shore disposal site in accordance with a NIEA license.

Doran Consulting were the designers for the project and the contractor was Graham Construction Ltd. As the project related to a maintenance dredging of a river bed with no impact on the river banks there was substantial scoping out particularly in relation to Sections on Land Use, Landscape Issues, Ecology, Historic Environment and Energy and Carbon.

The CEEQUAL Assessment scored highly in Sections 6 and 8-12. For example Section 6 Water Resources and the Water Environment scored 90% with high scoring for protection of the water environment through monitoring of Oxygen levels and prevention of any fuel discharge. Section 10 Transport scored 91% as traffic impact was minimal due to the decision early on to dispose of dredged material at sea through the use of barges.

River Lagan Dredging Works | CEEQUAL
Machinery for the project lifted into place
River Lagan Dredging Works | CEEQUAL
Site visit 14 October 2010
River Lagan Dredging Works | CEEQUAL
Site visit 1 November 2010

CEEQUAL insights and case studies

Browse the latest insights, thinking and case studies from CEEQUAL

 

Blue line to Barkarby | CEEQUAL
| CEEQUAL Case Studies, Rail, Scandinavia

Blue line to Barkarby, FUT4, Extended Metro Administration, Region Stockholm

The clients aim was to be able to measure the sustainability level between the different metro extension projects, make them ...
Read More
Dover Western Docks Revival (DWDR) – Port of Dover | CEEQUAL

Dover Western Docks Revival (DWDR) – Port of Dover

Dover Western Docks Revival (DWDR) is a one-off opportunity for the regeneration of Dover, bringing new investment into the area ...
Read More
M4 Junction 28 Improvements | CEEQUAL

M4 Junction 28 Improvements

The improvement of the junction is seen by the Welsh Government as an important part of its programme for economic ...
Read More
Blue line to Barkarby Access tunnel Robothöjden-Landningsbanan

Blue line to Barkarby Access tunnel Robothöjden-Landningsbanan

The project achieved a CEEQUAL Excellent rating. CEEQUAL enabled more discussions in the project group about sustainability which lead to ...
Read More
Rv3/Rv25 new highway between Loten-Elverum

Rv3/Rv25 new highway between Loten-Elverum

The main savings in the project as a result of implementation of CEEQUAL is related to transport and reuse of ...
Read More
Blue line to Barkarby Access tunnel Veddesta

Blue line to Barkarby Access tunnel Veddesta

The client’s drivers were primarily to use Ceequal as a tool to constantly improve the environmental and sustainability work and ...
Read More

Get in touch

Contact us now or call us on +443330147880 if you would like to talk to our team about how CEEQUAL can support you.

Tags