Project Summary

The site of the dredging works was the River Lagan which flows through the middle of Belfast. The dredging works were carried out on the impounded stretch of the River between the Stranmillis Weir and Lagan Weir. The Client was the Department for Social Development (DSD) who have a statutory obligation to maintain a minimum navigable depth of 1.5m throughout the impounded River Lagan.

A comprehensive dredging scheme was undertaken in 1994 which involved dredging of the impounded river and establishment of an incised channel. The dredging project in 2010/2011 was therefore considered a maintenance dredging of the river that involved reinstatement of the 1994 incised channel. All dredged material from the site was disposed of at an off shore disposal site in accordance with a NIEA license.

Doran Consulting were the designers for the project and the contractor was Graham Construction Ltd. As the project related to a maintenance dredging of a river bed with no impact on the river banks there was substantial scoping out particularly in relation to Sections on Land Use, Landscape Issues, Ecology, Historic Environment and Energy and Carbon.

The CEEQUAL Assessment scored highly in Sections 6 and 8-12. For example Section 6 Water Resources and the Water Environment scored 90% with high scoring for protection of the water environment through monitoring of Oxygen levels and prevention of any fuel discharge. Section 10 Transport scored 91% as traffic impact was minimal due to the decision early on to dispose of dredged material at sea through the use of barges.

River Lagan Dredging Works | CEEQUAL
Machinery for the project lifted into place
River Lagan Dredging Works | CEEQUAL
Site visit 14 October 2010
River Lagan Dredging Works | CEEQUAL
Site visit 1 November 2010

CEEQUAL insights and case studies

Browse the latest insights, thinking and case studies from CEEQUAL

 

Sea filling winter conditions BREEAM Infrastructure BRE Group

E16 Kvamskleiva

E16 Kvamskleiva was mainly a rock slide protection project in an area with steep mountain sides and frequent ice and ...
Read More
Flomsikring Mjøndalen sentrum Vassenga03 BRE Group

Flomsikring Mjøndalen sentrum – Vassenga

Flomsikring Mjøndalen - Vassenga is part of the flood defence project in Mjøndalen, aiming to reduce the flood risk in ...
Read More
Norway Audnadalen Artist Wichada Treepoonpon Sweco Norge BRE Group

E39 Mandal – Lyngdal øst

Nye Veier AS have, in collaboration with Sweco Norge AS, planned a new four-lane motorway from Mandal River through Lindesnes ...
Read More
Worcestershire Sustainable Infrastructure BRE Group

Worcestershire Parkway Regional Interchange

Worcestershire Parkway is a new station at the intersection of the Worcester to London (OWW line) and Birmingham to Bristol ...
Read More
BREEAM Infrastructure Version 6 for Projects Construction E16 Eggemoen Olum E02 Åsbygda Olum BRE Group

E16 Eggemoen-Olum, E02 Åsbygda-Olum

Skanska won a  contract from the Norwegian public Roads Administration in 2019 to build 10.4 km of new E16 road ...
Read More
Sege Park Sustainable Infrastructure BRE Group

Urban development project Sege Park

Sege Park urban development project is an urban development and regeneration project in Malmö. A former hospital area is being transformed ...
Read More

Get in touch

Contact us now or call us on +443330147880 if you would like to talk to our team about how CEEQUAL can support you.

Tags