Project Summary

Greenwich Millennium Village (GMV) is a mixed use, predominantly residential development, comprising of:

  • Approximately 1750 residential units;
  • 1,200 m2 A1 (shops), A2 (financial and professional services), A3 (restaurants/cafes), or A4 (drinking establishments) use;
  • 4,500 m2 B1 (office/research and development/light industrial) space;
  • 500 m2 D1 (nursery) use; and
  • 750 m2 D2 (community space).

 

The development will also contain an energy centre, associated open space, hard and soft landscaping, car parking and servicing, highways, and transport works.

GMV is an exemplar project, which encapsulates the Government’s commitment to sustainable development and the creation of sustainable communities. The CEEQUAL assessment covers Phases 3, 4 & 5 of the GMV development, with Phases 1 & 2 having already been constructed.

Greenwich Millennium Village: Parcel 3 | CEEQUAL

Challenges and Achievements

Water Environment

The development scored particularly well in the water environment section due to the consideration given to water attenuation, purification, and enhancement by the design team.

The development contains both hard and soft landscaping elements that allow the project site to attenuate a greater volume of water post-development compared to the pre-developed brownfield site. Hard landscaping elements include permeable paving in the car park areas, as well as 1.2 m diameter subsurface attenuation piping. Soft landscaping elements include brown roofs on all the buildings; planting in between the buildings; and a significantly sized swale which will connect to the existing Ecology Park. The lake in the Ecology Park currently suffers from periods of water shortage, which is damaging for the ecological and aquatic environment. The GMV development will direct excess rainfall into the lake from roofs of buildings to keep the water at a sufficient level.

Transport

The entire Greenwich Millennium Village site has been designed with sustainable transport in mind, with the inclusion of significant cycling infrastructure (cycle paths, cycle storage etc.), connection with local transport hubs at North Greenwich & Greenwich town centre, and the inclusion of several electric car charging points. Emphasis was placed on the integration of walking and cycling infrastructure into the design of public realm aspects of the development.

As the development has been, and will be, constructed in phases, considerable thought has been given to the management of construction traffic to reduce congestion and disruption to the existing traffic streams and future residents.

Greenwich Millennium Village: Parcel 3 | CEEQUAL

How did CEEQUAL influence your project?

CEEQUAL enabled the sustainable assessment of the civil aspects of the development, as these were not covered by the Code and BREEAM assessments being carried out in conjunction. Since a separate assessment is being carried out for each sub-phase of the project, the project design team have had the opportunity to review the documents that were carried out at the outline planning stage, and reiterate their conclusions and/or prompt further analysis. CEEQUAL allowed for recognition to be gained for those within the project team going the extra mile to pursue and encourage sustainable development.

Greenwich Millennium Village: Parcel 3 | CEEQUAL

CEEQUAL insights and case studies

Browse the latest insights, thinking and case studies from CEEQUAL

 

Worcestershire Sustainable Infrastructure | BRE Group

Worcestershire Parkway Regional Interchange

Worcestershire Parkway is a new station at the intersection of the Worcester to London (OWW line) and Birmingham to Bristol ...
Read More
BREEAM Infrastructure Version 6 for Projects Construction E16 Eggemoen Olum E02 Åsbygda Olum | BRE Group

E16 Eggemoen-Olum, E02 Åsbygda-Olum

Skanska won a  contract from the Norwegian public Roads Administration in 2019 to build 10.4 km of new E16 road ...
Read More
Sege Park Sustainable Infrastructure | BRE Group

Urban development project Sege Park

Sege Park urban development project is an urban development and regeneration project in Malmö. A former hospital area is being transformed ...
Read More
light rail sustainable and safer city Bybanen Bergen | BRE Group

Bybanen D11 Sentrum

To achieve a more sustainable and safer city, Bybanen Bergen, are building a light rail. The first phase of the ...
Read More
Lillestrøm pumping station | BRE Group

Pumpestasjon PA240 – Lillestrøm Kommune

Construction of a new pumping station infrastructure in the municipality of Lillestrøm. The project has great social significance in terms ...
Read More
Westside Metro Extension Phase One | BRE Group

Birmingham Westside Metro – Centenary Square Extension

The Midland Metro Alliance (MMA) is working on behalf of Transport for West Midlands (TfWM), which is part of the ...
Read More

Get in touch

Contact us now or call us on +443330147880 if you would like to talk to our team about how CEEQUAL can support you.

Tags