ClientScottish Water
DesignBDPBlack & Veatch and ERM
ConstructionBlack & Veatch
Assessor: Neil McCulloch

Project Summary

Scottish Water’s new Glencorse Water Treatment Works (WTW) is delivering 21st century drinking water to around 450,000 people across Scotland’s modern capital city. The works replaces two ageing facilities at Fairmilehead and Alnwickhill, which despite having served the city well for more than a century, now need replacing.

Combining engineering feasibility reports with the results of the largest ever community consultation in Scottish Water’s history the site at Glencorse in Midlothian was chosen for the project to take place.

Capable of supplying Edinburgh with up to 175-million litres of clear, fresh drinking water everyday, the Glencorse project has sustainability at its core. A third of the works energy needs will be provided by an on-site hydro turbine. This is driven by the raw water which arrives from reservoirs in the Borders using gravity alone.

This raw water supply is treated beneath the largest ‘grass’ roof in Scotland, before being stored in a 90 million litre storage tank – one of the largest in Europe – and is delivered to customers across the city, again using gravity alone. Rain water harvested from the ‘grass’ roof is passed to bio-diverse wetlands that provide a rich habitat for indigenous plants, animals and insects.

Glencorse Water Treatment Works Part 2 | CEEQUAL

 

Influence of CEEQUAL

Considering CEEQUAL, Scottish Water and Black & Veatch introduced a world first, a mobile pipeline production unit. The plant was located next to the trunk main route allowing engineers to roll the pipes out of the factory and straight into the ground. This helped to save more than a million lorry miles and the associated carbon dioxide emissions.

Tunnelling underneath the Edinburgh City Bypass allowed work on the pipeline to progress without disturbing the thousands of commuters who use this vital artery every day.

Achievements

The Historic Environment

Following early archaeological investigations a Roman Marching Camp was discovered. Again neighbours were consulted to decide the relocation of the treatment building, preserving this historic site. This information was presented along with Cromwellian finds and evidence of a WWII Army Camp that was unearthed during excavations – resulting in 177 visitors to an Archaeological Open Day for Residents.

Waste Management

Spoil from initial excavation work was stored on site, to be used in landscaping the facility, blending it into the Pentland Hills. This helped to reduce construction traffic by 75%, making local roads safer. The use of recycled materials on-site also exceeded 25%.

Effects on Neighbours

Those residing round the WTW’s perimeter have been consulted throughout, providing input into the height and scale of final landscaping. Homeowners were even consulted on the location of individual trees providing final landscaping.

Award Presentation

Glencorse Water Treatment Works Part 2 | CEEQUAL

Glencorse Water Treatment Works Part 2 | CEEQUAL

CEEQUAL insights and case studies

Browse the latest insights, thinking and case studies from CEEQUAL

 

Sustainable Rail construction Leeds Station

Transpennine Route Upgrade (TRU) Leeds Station Capacity

Leeds Station Capacity is the first project to be completed as part of the TRU programme. All TRU projects are ...
BREEAM-Infrastructure-sustainable-Bergen-Norway-underground-station-platforms

Bybanen D13 Haukeland Holdeplass

Bybanen D13 Haukeland Holdeplass is the very first underground station at the light rail system in Bergen, Norway.  It has ...
A77 Maybole bypass southern roundabout sustainable infrastructure

A77 Maybole Bypass Construction Award

The A77 Maybole Bypass reduces journey times on the A77 by diverting traffic away from the High Street of the ...
Drone Photo of new jetty at Thanckes Oil Fuel Depot

Thanckes Oil Fuel Depot Loading Facility & Tank Farm Fire Fighting Upgrade

VolkerStevin constructs a new jetty at Thanckes Oil Fuel Depot to provide fuelling facilities for the Royal Navy at Devonport ...
7 Black Cart Cycleway Bridge - Installed

Glasgow Airport Investment Area Leads in Sustainable Infrastructure Innovation

The Glasgow Airport Investment Area (GAIA) project creates the connections and sustainable infrastructure of Scotland's manufacturing innovation district ...

Get in touch

Contact us now or call us on +443330147880 if you would like to talk to our team about how CEEQUAL can support you.

Tags