Glenconway Wind Farm

Sun Above The Solar Farm BRE Group

CEEQUAL Excellent (82.0%) – Whole Project Award
Version 4, Jul 2017 | Glenconway, Northern Ireland

ClientSSE Renewables UK Ltd
Designer: Byrne Looby & PartnersArup and WDR-RT-Taggart
ContractorGael Force Renewables Ltd
Assessor: Pat Tierney

 

Project Summary

The Glenconway Wind Farm was developed by Gael Force Renewables Ltd, a Joint Venture between McLaughlin & Harvey, Barr and WH Alexander on behalf of the client SSE Renewables. The project started in May 2012 and was completed in March 2013.

The overall project comprised the design and construction of the 18.4 MW-rated Wind Farm. This included 8 No. 2.3 MW rated Siemens wind turbines and associated access tracks of approximately 3.5km, crane hardstands, laydown areas, drainage systems, site compound, a permanent meteorological mast and a substation. The enabling works involved the design and construction of a 10 metre clear span bridge crossing over a tributary of the Loughermore River which was piled using steel mini piles. The works also involved the removal of the existing river crossing once the permanent crossing was installed.

CEEQUAL insights and case studies

Browse the latest insights, thinking and case studies from CEEQUAL

 

Dundee Central Waterfront 02 full BRE Group

Dundee Central Waterfront: Contract 4

The transformation of Dundee’s waterfront reached a major milestone at the end of February 2016 with the opening to the ...
Read More
Crossrail Surface Works Stockley Flyover 01 FINAL BRE Group
| CEEQUAL Case Studies, Rail, UK

Crossrail Surface Works: Stockley Flyover

Stockley Flyover is a £90 million Crossrail Project and after number of years of construction is almost complete. The objective ...
Read More
Crossrail Whitechapel And Liverpool Steet SCL 08 BRE Group
| CEEQUAL Case Studies, Rail, UK

Crossrail: Eleanor Street & Mile End Road Shafts

Crossrail is delivering the Elizabeth line – a new railway for London and the South East. When it opens through ...
Read More
Colwyn Bay Waterfront Project LS 1 E1576834169108 BRE Group

Colwyn Bay Waterfront Project – Design of Vibrant and Viable Places (VVP) Phase 2 Promenade Enhancements

This project represents Phase 2 of the Colwyn Bay Waterfront Project, a major scheme delivered by Conwy County Borough Council ...
Read More
Crossrail Whitechapel And Liverpool Steet SCL 01A BRE Group
| CEEQUAL Case Studies, Rail, UK

Crossrail: Whitechapel and Liverpool Street SCL

Crossrail C510 Whitechapel and Liverpool Street Station Tunnels is a major tunnelling contract awarded as part of Crossrail, Europe’s largest ...
Read More
Peace Bridge 4 BRE Group

The Peace Bridge

The Peace Bridge is a 312 metre self-anchored suspension bridge for the use of pedestrians and cyclists and the newest ...
Read More

Get in touch

Contact us now or call us on +443330147880 if you would like to talk to our team about how CEEQUAL can support you.

Tags