Glenconway Wind Farm

Sun Above The Solar Farm BRE Group

CEEQUAL Excellent (82.0%) – Whole Project Award
Version 4, Jul 2017 | Glenconway, Northern Ireland

ClientSSE Renewables UK Ltd
Designer: Byrne Looby & PartnersArup and WDR-RT-Taggart
ContractorGael Force Renewables Ltd
Assessor: Pat Tierney

 

Project Summary

The Glenconway Wind Farm was developed by Gael Force Renewables Ltd, a Joint Venture between McLaughlin & Harvey, Barr and WH Alexander on behalf of the client SSE Renewables. The project started in May 2012 and was completed in March 2013.

The overall project comprised the design and construction of the 18.4 MW-rated Wind Farm. This included 8 No. 2.3 MW rated Siemens wind turbines and associated access tracks of approximately 3.5km, crane hardstands, laydown areas, drainage systems, site compound, a permanent meteorological mast and a substation. The enabling works involved the design and construction of a 10 metre clear span bridge crossing over a tributary of the Loughermore River which was piled using steel mini piles. The works also involved the removal of the existing river crossing once the permanent crossing was installed.

CEEQUAL insights and case studies

Browse the latest insights, thinking and case studies from CEEQUAL

 

8Landscaping And Biodiversity Protection Under Hydal Bridge©Nye Veier BRE Group

E18 Rugtvedt – Dørdal

The project is a 16.5km four-lane motorway in Telemark, Norway with a 110 km/hour speed limit. The state-owned company, Nye ...
Read More
Lahti 1 BRE Group

Lahti Southern Ring Road (Vt12), VALTARI alliance

This project, undertaken by the VALTARI alliance, involves the construction of a 4.5km southern ring road, bypassing the center of ...
Read More
RAF Lossiemouth Featured BRE Group

RAF Lossiemouth – AOS Project

The project is a full refurbishment of all major airside pavement surfaces at RAF Lossiemouth for a new Boeing P8 ...
Read More
Arenastaden Plattform BRE Group
| CEEQUAL Case Studies, Rail, Scandinavia

Stockholm Extended Metro – Arenastaden

The extension of the Stockholm Metro is vital to make Stockholm a vibrant and accessible city with a sustainable public ...
Read More
Old Colwyn Coastal Defence and Active Travel Scheme BRE Group

Old Colwyn Coastal Defence and Active Travel Scheme

The scheme represented an opportunity to build on the success of previous phases of the Colwyn Bay Waterfront Project with ...
Read More

Get in touch

Contact us now or call us on +443330147880 if you would like to talk to our team about how CEEQUAL can support you.

Tags