Glenconway Wind Farm

CEEQUAL Excellent (82.0%) – Whole Project Award
Version 4, Jul 2017 | Glenconway, Northern Ireland

ClientSSE Renewables UK Ltd
Designer: Byrne Looby & PartnersArup and WDR-RT-Taggart
ContractorGael Force Renewables Ltd
Assessor: Pat Tierney

 

Project Summary

The Glenconway Wind Farm was developed by Gael Force Renewables Ltd, a Joint Venture between McLaughlin & Harvey, Barr and WH Alexander on behalf of the client SSE Renewables. The project started in May 2012 and was completed in March 2013.

The overall project comprised the design and construction of the 18.4 MW-rated Wind Farm. This included 8 No. 2.3 MW rated Siemens wind turbines and associated access tracks of approximately 3.5km, crane hardstands, laydown areas, drainage systems, site compound, a permanent meteorological mast and a substation. The enabling works involved the design and construction of a 10 metre clear span bridge crossing over a tributary of the Loughermore River which was piled using steel mini piles. The works also involved the removal of the existing river crossing once the permanent crossing was installed.

CEEQUAL insights and case studies

Browse the latest insights, thinking and case studies from CEEQUAL

 

7 Black Cart Cycleway Bridge - Installed

Glasgow Airport Investment Area Leads in Sustainable Infrastructure Innovation

The Glasgow Airport Investment Area (GAIA) project creates the connections and sustainable infrastructure of Scotland's manufacturing innovation district ...
Tullgarnsbron E01 Sustainable Infrastructure BREEAM

Tullgarnsbron E01 Bridge Sustainability Assessment

CEEQUAL (now known as BREEAM Infrastructure) sustainability assessment for new bridge being built over the Fyris river, an extension of ...
E16 Kvamskleiva

E16 Kvamskleiva

E16 Kvamskleiva was mainly a rock slide protection project in an area with steep mountain sides and frequent ice and ...
Flomsikring-Mjøndalen-sentrum-Vassenga BREEAM Infrastructure

Flomsikring Mjøndalen sentrum – Vassenga

Flomsikring Mjøndalen - Vassenga is part of the flood defence project in Mjøndalen, aiming to reduce the flood risk in ...
Norway’s highest bridge, in Audnadalen, planned nicely to fit in the landscape. Artist: Wichada Treepoonpon, Sweco Norge.

E39 Mandal – Lyngdal øst

Nye Veier AS have, in collaboration with Sweco Norge AS, planned a new four-lane motorway from Mandal River through Lindesnes ...