Glenconway Wind Farm

Sun Above The Solar Farm BRE Group

CEEQUAL Excellent (82.0%) – Whole Project Award
Version 4, Jul 2017 | Glenconway, Northern Ireland

ClientSSE Renewables UK Ltd
Designer: Byrne Looby & PartnersArup and WDR-RT-Taggart
ContractorGael Force Renewables Ltd
Assessor: Pat Tierney

 

Project Summary

The Glenconway Wind Farm was developed by Gael Force Renewables Ltd, a Joint Venture between McLaughlin & Harvey, Barr and WH Alexander on behalf of the client SSE Renewables. The project started in May 2012 and was completed in March 2013.

The overall project comprised the design and construction of the 18.4 MW-rated Wind Farm. This included 8 No. 2.3 MW rated Siemens wind turbines and associated access tracks of approximately 3.5km, crane hardstands, laydown areas, drainage systems, site compound, a permanent meteorological mast and a substation. The enabling works involved the design and construction of a 10 metre clear span bridge crossing over a tributary of the Loughermore River which was piled using steel mini piles. The works also involved the removal of the existing river crossing once the permanent crossing was installed.

CEEQUAL insights and case studies

Browse the latest insights, thinking and case studies from CEEQUAL

 

LBS Western Side BRE Group
| CEEQUAL Case Studies, Rail, UK

Thameslink Programme, London Bridge Station (Western Approach Viaduct)

The Thameslink Programme is a £7 billion project in south-east England to upgrade and expand the Thameslink rail network, allowing ...
Read More
Architecture 1837176 1920 BRE Group

A27 Chichester Drainage Scheme

The works involve the renewal of the existing drainage linear soakaways to relieve the re-occurant flooding along the bypass ...
Read More
Shinfield Eastern Aerial BRE Group

Shinfield Eastern Relief Road

Construction of a new single span overbridge over the M4 with approximately 1.6 km of relief road around the village ...
Read More
Filton Bank After BRE Group
| CEEQUAL Case Studies, Rail, UK

Dr Days to Filton Abbey Wood Capacity Improvement (also referred to as “Filton Bank 4 Track”)

Filton Bank was a design and build project, reinstating 2 former tracks between Dr Days Junction to the South and ...
Read More
Barkarbystaden West Ticket Hall Entrance BRE Group
| CEEQUAL Case Studies, Rail, Scandinavia

Blue line to Barkarby, FUT4, Extended Metro Administration, Region Stockholm

The clients aim was to be able to measure the sustainability level between the different metro extension projects, make them ...
Read More
Dover 1 BRE Group

Dover Western Docks Revival (DWDR) – Port of Dover

Dover Western Docks Revival (DWDR) is a one-off opportunity for the regeneration of Dover, bringing new investment into the area ...
Read More

Get in touch

Contact us now or call us on +443330147880 if you would like to talk to our team about how CEEQUAL can support you.

Tags