7 Black Cart Cycleway Bridge - Installed

Glasgow Airport Investment Area Leads in Sustainable Infrastructure Innovation

7 Black Cart Cycleway Bridge - Installed

CEEQUAL Excellent – Construction Only Assessment

Version 6, 2022 | Glasgow, UK

Assessed by: Stuart Angus Wills Bros Civil Engineering Ltd
Verified by: Keira McLuskey Network Rail
Client: Renfrewshire Council
Contractor: Wills Bros Civil Engineering Ltd

Project Summary

The Glasgow Airport Investment Area (GAIA) project creates the connections and infrastructure underpinning the development of Scotland’s manufacturing innovation district. It includes new roads, bridges, cycling routes and pedestrian footpaths, which will connect the Advanced Manufacturing Innovation District Scotland (AMIDS) and the nearby Westway and Inchinnan Business Parks.

The £39.1million Glasgow City Region City Deal funded GAIA project will support the AMIDS which in turn will bring new employers, jobs and opportunities to the City Region and ensure the continued success of Glasgow Airport.

Key features of the project:

• Abbotsinch Road has been realigned, upgraded, and extended, with accompanying pedestrian and cycle facilities to create a route through Netherton Campus, the central site of the manufacturing district.

• A two-lane bridge for pedestrians, cyclists and commercial traffic across the White Cart River from an approach road off Arran Avenue to Wright Street. The bridge includes a connection into Wright Street business premises, with no through route along Wright Street for vehicles. This reduces the impact of traffic on residential areas and the bridge also connects with the proposed Paisley to Renfrew cycle route, currently under development.

• A 100m long, single-span pedestrian and cycle bridge over the Black Cart, connecting Abbotsinch Road to Greenock Road. Installation of the 160-tonne steel structure was undertaken by tandem crane lift during an overnight airport closure due to the proximity to the runway.

• New and improved junctions and connections to existing cycling and pedestrian routes.

• An innovative lightweight protection structure for a series of fragile high voltage cables which substituted reinforced concrete piles and beams with 6000 recycled plastic geocellular crates and lightweight ‘LECA’ fill material.

• Over 330 extra heavy standard and semi-mature trees planted on the scheme to create an attractive avenue-style environment along the realigned road.

 

Black Cart Cycleway Bridge - Tandem Crane Lift

Metrics

Embodied carbon emissions 12,435 kg CO2 equivalent 20% reduction achieved
Operational renewable energy potential 1,656 kWh per year 5% of total energy use
Re-used material 31558 m3 55% of total material excavated
Waste diverted from landfill N/A tonnes or m3 100% of total inert/non-haz waste

Financial Benefits

In your view, has CEEQUAL represented value for money?

Yes. Whilst we weren’t able to quantify any financial benefits, CEEQUAL provided a framework which encouraged sustainable decision-making in the construction phase of the project.

 

Wright St Link Bridge - Precast Beam Installation

Achievements

100% of non-hazardous wastes were diverted from landfill and either reused, recycled or used to generate waste derived fuels.

20% reduction in carbon emissions achieved when compared to baseline.

 

Vertical Drainage Installation sustainable infrastructure

Further Information

What were the main challenges for the project and how were these overcome?

Dealing with very poor ground conditions under the footprint of the new road. This required the use of vertical drains, observation of settlement periods and the use of geogrids to achieve a solid foundation.

Drainage Attenuation Tank Installation

What were the drivers and perceived benefits for undertaking a CEEQUAL assessment on this project?

There was a greater focus on opportunities to minimise waste and maximise resource efficiency than there would likely have otherwise been.

What elements of this project highlight best practice and innovation?

The innovative cable protection structure eliminated huge quantities of reinforced concrete and replacing them with recycled plastic and air.

 

132kV Lightweight Embankment Installation

Quotes

“By undertaking a CEEQUAL assessment we gave ourselves a reason to bring together key members of the project team at regular intervals and challenge them to think about sustainability as part of their day-to-day decision-making on things such as methods of working and material selection.”

Stuart Angus – Design & Sustainability Manager, Wills Bros (Contractor)

BREEAM Infrastructure insights and case studies

Browse the latest insights, thinking and case studies from BREEAM Infrastructure

 

A30 Temple to Higher Carblake | CEEQUAL

A30 Temple to Higher Carblake

The A30 Temple to Higher Carblake Improvement is a £60 million highway improvement scheme part funded by Cornwall Council and ...
Laggan-Tormore, Site Preparation Earthworks – Shetland Gas Plant | CEEQUAL
| CEEQUAL Case Studies, Energy, UK

Laggan-Tormore, Site Preparation Earthworks – Shetland Gas Plant

Total Exploration and Production Limited (TEPUK) are developing the Laggan and Tormore gas fields, located offshore roughly 90 km west ...
New Low Level Waste Facility

New Low Level Waste Facility

The project involved the Design and Build of two sub-surface vaults for the disposal of solid low-level radioactive waste from ...
E16 Bagn-Bjørgo, Norway

E16 Bagn-Bjørgo, Norway

E16 Bagn–Bjørgo is an 11.1 km stretch of the main road between Norway’s capitol Oslo and the second largest city, ...
Olympic Park: Media Hub Multi-Storey Car Park | CEEQUAL

Olympic Park: Media Hub Multi-Storey Car Park (MSCP)

The design and construction process responded to the high standards for sustainability set out by the Olympic Delivery Authority, achieving ...
Frodsham Wind Farm
| CEEQUAL Case Studies, Energy, UK

Frodsham Wind Farm

Frodsham Wind Farm is one of England’s largest onshore generating stations, and the largest in the Cheshire region, with an ...

Get in touch

Contact us now or call us on +443330147880 if you would like to talk to our team about how BREEAM Infrastructure can support you.