Flens Framtida Vattenförsörjning | CEEQUAL

Flens Framtida Vattenförsörjning

Flens Framtida Vattenförsörjning | CEEQUAL

CEEQUAL Excellent (75.5%) – Design Only Award
Version 5, May 2017 | Flen, Sweden

DesignWSP
Assessor: Rebecca Johansson and Katarina Wärmark (WSP)

Project Summary

The ‘Flens framtida vattenförsörjning’ project aims to secure the future water demand and quality in Flen, Sweden. WSP was contracted for the design of a new 20 kilometre pipeline to transfer water from a nearby municipality to solve the water quality issues that currently affect the area. As the ground was already being prepared, the opportunity was taken to install a wastewater pipeline at the same time and so this was also included in the design. The design phase of the project was finalised in December 2015, resulting in a tender specification for the client to procure a contractor.

Flens Framtida Vattenförsörjning | CEEQUAL

Sustainability Aims

CEEQUAL is being used increasingly in Sweden to give civil engineering projects a systematic approach to sustainability. WSP used CEEQUAL on the project as a way of evaluating and calibrating how sustainability can be further integrated in WSP’s working processes. The identification of possible enhancements on how WSP can deliver more sustainable projects was therefore an important aim. A further aim was to increase awareness among the designers on how they are working with sustainability issues and their contribution to a project’s sustainability performance.

Flens Framtida Vattenförsörjning | CEEQUAL

Challenges and Achievements

Many of the sustainability aspects were handled by adjusting the extensive application for permission. The location of the pipeline was adjusted several times in order to avoid intrusion in areas of value and to minimise disruption. Areas with high cultural, historical, ecological or biological values were avoided, as well as areas with previous industrial/military activities that might contaminate the land. Existing pipelines and future development plans were taken into consideration to minimise the use of resources, ease maintenance, and increase flexibility.

Both the construction method and pipeline location were part of the design, taking account of direct cost for construction and long-term cost during operation. The construction method, and the timing and duration of construction, were key aspects affecting the extent of disruption. Gentle construction techniques and considerate times for construction were therefore chosen. Opinions from consultation with landowners and other parties of interest were highly valued in terms of where to locate the pipeline and when to perform construction.

The project selected materials based on information about their carbon footprint, durability, and flexibility during construction and maintenance. A calculation of the embodied water in the building materials specified was also performed.

Flens Framtida Vattenförsörjning | CEEQUAL

How did CEEQUAL influence your project?

All sections of CEEQUAL were more or less integrated in the project during decision-making, but the work with the chapter ‘Physical Resources – Use and Management’ is the section where the biggest improvements were made. By using CEEQUAL on the Flens framtida vattenförsörjning project, WSP has developed a systematic approach to integrate sustainability within civil engineering projects. Additionally, several sustainability tools, custom-made for the designers at WSP Sweden and the projects WSP are involved in, were developed during this process.

Flens Framtida Vattenförsörjning | CEEQUAL

Flens Framtida Vattenförsörjning | CEEQUAL

CEEQUAL insights and case studies

Browse the latest insights, thinking and case studies from CEEQUAL

 

Tullgarnsbron E01 Sustainable Infrastructure BREEAM

Tullgarnsbron E01 Bridge Sustainability Assessment

CEEQUAL (now known as BREEAM Infrastructure) sustainability assessment for new bridge being built over the Fyris river, an extension of ...
Sea filling winter conditions

E16 Kvamskleiva

E16 Kvamskleiva was mainly a rock slide protection project in an area with steep mountain sides and frequent ice and ...
Flomsikring-Mjøndalen-sentrum-Vassenga BREEAM Infrastructure

Flomsikring Mjøndalen sentrum – Vassenga

Flomsikring Mjøndalen - Vassenga is part of the flood defence project in Mjøndalen, aiming to reduce the flood risk in ...
Norway’s highest bridge, in Audnadalen, planned nicely to fit in the landscape. Artist: Wichada Treepoonpon, Sweco Norge.

E39 Mandal – Lyngdal øst

Nye Veier AS have, in collaboration with Sweco Norge AS, planned a new four-lane motorway from Mandal River through Lindesnes ...
Worcestershire Sustainable Infrastructure

Worcestershire Parkway Regional Interchange

Worcestershire Parkway is a new station at the intersection of the Worcester to London (OWW line) and Birmingham to Bristol ...
BREEAM Infrastructure Version 6 for Projects Construction E16 Eggemoen-Olum, E02 Åsbygda-Olum

E16 Eggemoen-Olum, E02 Åsbygda-Olum

Skanska won a  contract from the Norwegian public Roads Administration in 2019 to build 10.4 km of new E16 road ...

Get in touch

Contact us now or call us on +443330147880 if you would like to talk to our team about how CEEQUAL can support you.