CEEQUAL Excellent (81.6%) – Construction Only Award
Version 5, Dec 2015 | Dundee, Scotland

ContractorSir Robert McAlpine
Assessor: Kirsty Webster (Sir Robert McAlpine)

Dundee Central Waterfront: Contract 4 | CEEQUAL

Project Summary

The transformation of Dundee’s waterfront reached a major milestone at the end of February 2016 with the opening to the public of a new road and pavement network constructed by Sir Robert McAlpine. The opening brings to a conclusion a series of three projects with a combined total value of £27.8 million undertaken by the company over four years as part of the Waterfront scheme. The Contract 4 project involved a range of works within Slessor Gardens, the large avenue of open space created at the heart of the Central Waterfront area, extending from the Caird Hall complex towards the River Tay.

The team’s responsible approach saw the award of a second CEEQUAL Excellent award for the project within the space of 12 months. The award recognises exceptional performance on infrastructure, landscaping and planting works for a major new civic space completed as part of the Waterfront scheme. A variety of opportunities for local operatives and companies were provided, and achieved exceptional levels of recycling, with only 2 tonnes of inert waste sent to landfill from the more than 45,000 tonnes generated from the works.

Other Dundee City Council projects benefited from the recycling strategy, including the preparation of a platform for a new recycling centre, the infilling of Discovery Dock, and the formation of an access ramp to Seabraes Bridge.

 

Dundee Central Waterfront: Contract 4 | CEEQUAL

CEEQUAL insights and case studies

Browse the latest insights, thinking and case studies from CEEQUAL

 

Stockholm Extended Metro Arenastaden Plattform | CEEQUAL
| CEEQUAL Case Studies, Rail, Scandinavia

Stockholm Extended Metro – Arenastaden

The extension of the Stockholm Metro is vital to make Stockholm a vibrant and accessible city with a sustainable public ...
Read More
Old Colwyn Coastal Defence and Active Travel Scheme | CEEQUAL

Old Colwyn Coastal Defence and Active Travel Scheme

The scheme represented an opportunity to build on the success of previous phases of the Colwyn Bay Waterfront Project with ...
Read More
Viking Link Bicker Fen Access Road | CEEQUAL

Viking Link (Bicker Fen) Access Road

The Viking Link team used CEEQUAL to deliver a sustainability-driven project. They achieved a 30% reduction in kgCO2 equivalent of ...
Read More
Strule SEC – Site Preparation Works
| CEEQUAL Case Studies, Remediation works, UK

Strule SEC – Site Preparation Works

The purpose of the project was to redevelop the former army barracks at Lisanelly and St Lucia and to provide ...
Read More
Expo 2020 Dubai

Expo 2020 Dubai

Expo 2020 Dubai aims to be one of the most sustainable World Expos in history. For its permanent infrastructure assets, ...
Read More
St Austell Bay Resilient Regeneration (StARR) Project
| CEEQUAL Case Studies, Flood Alleviation, UK

St Austell Bay Resilient Regeneration (StARR) Project

The St Austell Bay Resilient Regeneration (StARR) project is a combination of urban and upstream interventions, which aims to reduce ...
Read More

Get in touch

Contact us now or call us on +443330147880 if you would like to talk to our team about how CEEQUAL can support you.

Tags