Dundee Central Waterfront: Contract 4 | CEEQUAL

Dundee Central Waterfront: Contract 4

Dundee Central Waterfront: Contract 4 | CEEQUAL

CEEQUAL Excellent (81.6%) – Construction Only Award
Version 5, Dec 2015 | Dundee, Scotland

ContractorSir Robert McAlpine
Assessor: Kirsty Webster (Sir Robert McAlpine)

Dundee Central Waterfront: Contract 4 | CEEQUAL

Project Summary

The transformation of Dundee’s waterfront reached a major milestone at the end of February 2016 with the opening to the public of a new road and pavement network constructed by Sir Robert McAlpine. The opening brings to a conclusion a series of three projects with a combined total value of £27.8 million undertaken by the company over four years as part of the Waterfront scheme. The Contract 4 project involved a range of works within Slessor Gardens, the large avenue of open space created at the heart of the Central Waterfront area, extending from the Caird Hall complex towards the River Tay.

The team’s responsible approach saw the award of a second CEEQUAL Excellent award for the project within the space of 12 months. The award recognises exceptional performance on infrastructure, landscaping and planting works for a major new civic space completed as part of the Waterfront scheme. A variety of opportunities for local operatives and companies were provided, and achieved exceptional levels of recycling, with only 2 tonnes of inert waste sent to landfill from the more than 45,000 tonnes generated from the works.

Other Dundee City Council projects benefited from the recycling strategy, including the preparation of a platform for a new recycling centre, the infilling of Discovery Dock, and the formation of an access ramp to Seabraes Bridge.

 

Dundee Central Waterfront: Contract 4 | CEEQUAL

CEEQUAL insights and case studies

Browse the latest insights, thinking and case studies from CEEQUAL

 

Blue line to Barkarby | CEEQUAL
| CEEQUAL Case Studies, Rail, Scandinavia

Blue line to Barkarby, FUT4, Extended Metro Administration, Region Stockholm

The clients aim was to be able to measure the sustainability level between the different metro extension projects, make them ...
Read More
Dover Western Docks Revival (DWDR) – Port of Dover | CEEQUAL

Dover Western Docks Revival (DWDR) – Port of Dover

Dover Western Docks Revival (DWDR) is a one-off opportunity for the regeneration of Dover, bringing new investment into the area ...
Read More
M4 Junction 28 Improvements | CEEQUAL

M4 Junction 28 Improvements

The improvement of the junction is seen by the Welsh Government as an important part of its programme for economic ...
Read More
Blue line to Barkarby Access tunnel Robothöjden-Landningsbanan

Blue line to Barkarby Access tunnel Robothöjden-Landningsbanan

The project achieved a CEEQUAL Excellent rating. CEEQUAL enabled more discussions in the project group about sustainability which lead to ...
Read More
Rv3/Rv25 new highway between Loten-Elverum

Rv3/Rv25 new highway between Loten-Elverum

The main savings in the project as a result of implementation of CEEQUAL is related to transport and reuse of ...
Read More
Blue line to Barkarby Access tunnel Veddesta

Blue line to Barkarby Access tunnel Veddesta

The client’s drivers were primarily to use Ceequal as a tool to constantly improve the environmental and sustainability work and ...
Read More

Get in touch

Contact us now or call us on +443330147880 if you would like to talk to our team about how CEEQUAL can support you.

Tags