Project Summary

The transformation of Dundee’s waterfront reached a major milestone at the end of February 2016 with the opening to the public of a new road and pavement network constructed by Sir Robert McAlpine. The opening brings to a conclusion a series of three projects with a combined total value of £27.8 million undertaken by the company over four years as part of the Waterfront scheme. The Contract 4 project involved a range of works within Slessor Gardens, the large avenue of open space created at the heart of the Central Waterfront area, extending from the Caird Hall complex towards the River Tay.

The team’s responsible approach saw the award of a second CEEQUAL Excellent award for the project within the space of 12 months. The award recognises exceptional performance on infrastructure, landscaping and planting works for a major new civic space completed as part of the Waterfront scheme. A variety of opportunities for local operatives and companies were provided, and achieved exceptional levels of recycling, with only 2 tonnes of inert waste sent to landfill from the more than 45,000 tonnes generated from the works.

Other Dundee City Council projects benefited from the recycling strategy, including the preparation of a platform for a new recycling centre, the infilling of Discovery Dock, and the formation of an access ramp to Seabraes Bridge.

 

Dundee Central Waterfront: Contract 4 | CEEQUAL

CEEQUAL insights and case studies

Browse the latest insights, thinking and case studies from CEEQUAL

 

Meadow Lane Waterfront Regeneration

Meadow Lane Waterfront Regeneration

Over a five year period there has been quality improvements to the Nottingham Beeston Canal towpath where pedestrian counters and ...
Glenconway Wind Farm
| CEEQUAL Case Studies, Energy, UK

Glenconway Wind Farm

The Glenconway Wind Farm was developed by Gael Force Renewables Ltd, a Joint Venture between McLaughlin & Harvey, Barr and ...
Eastern Bay Link

Eastern Bay Link

The Eastern Bay Link scheme extends the A4232 link road, situated south of Cardiff, reducing the current journey by 2.5 ...
Foryd Harbour Public Realm

Foryd Harbour Public Realm

The Rhyl Harbour project formed part of a stream that included a sustainable transport bridge, coastal erosion and flood protection ...
Crossrail: Connaught Tunnel and Surface Railway | CEEQUAL
| CEEQUAL Case Studies, Rail, UK

Crossrail: Connaught Tunnel and Surface Railway

The Connaught Tunnel Refurbishment Project transformed an abandoned 1878 Victorian tunnel and disused railway and re-engineered it to receive the ...
Colwyn Bay: Phase 1 – Flood Defence | CEEQUAL

Colwyn Bay: Phase 1 – Flood Defence

The coastal defences along the Colwyn Bay frontage had several key issues to address through developments and improvements. As a ...

Get in touch

Contact us now or call us on +443330147880 if you would like to talk to our team about how CEEQUAL can support you.

Tags