Dundee Central Waterfront: Contract 4

Dundee Central Waterfront: Contract 4 | CEEQUAL

CEEQUAL Excellent (81.6%) – Construction Only Award
Version 5, Dec 2015 | Dundee, Scotland

ContractorSir Robert McAlpine
Assessor: Kirsty Webster (Sir Robert McAlpine)

Dundee Central Waterfront: Contract 4 | CEEQUAL

Project Summary

The transformation of Dundee’s waterfront reached a major milestone at the end of February 2016 with the opening to the public of a new road and pavement network constructed by Sir Robert McAlpine. The opening brings to a conclusion a series of three projects with a combined total value of £27.8 million undertaken by the company over four years as part of the Waterfront scheme. The Contract 4 project involved a range of works within Slessor Gardens, the large avenue of open space created at the heart of the Central Waterfront area, extending from the Caird Hall complex towards the River Tay.

The team’s responsible approach saw the award of a second CEEQUAL Excellent award for the project within the space of 12 months. The award recognises exceptional performance on infrastructure, landscaping and planting works for a major new civic space completed as part of the Waterfront scheme. A variety of opportunities for local operatives and companies were provided, and achieved exceptional levels of recycling, with only 2 tonnes of inert waste sent to landfill from the more than 45,000 tonnes generated from the works.

Other Dundee City Council projects benefited from the recycling strategy, including the preparation of a platform for a new recycling centre, the infilling of Discovery Dock, and the formation of an access ramp to Seabraes Bridge.

 

Dundee Central Waterfront: Contract 4 | CEEQUAL

CEEQUAL insights and case studies

Browse the latest insights, thinking and case studies from CEEQUAL

 

Ramsdal bridge BREEAM Infrastructure

E39 Mandal øst – Mandal

E39 Mandal East- Mandal city consist of a 7 km long four lane highway that together with the new E39 ...
BREEAM Infrastructure Bybanen D18 Sykkelvei Kronstadtunnelen

Bybanen D18 Sykkelvei Kronstadtunnelen

Project D18 Sykkelvei Kronstadtunnelen is part of the Bybanen-light rail construction stage 4 development scheme. This is the largest development ...
Sustainable Rail construction Leeds Station

Transpennine Route Upgrade (TRU) Leeds Station Capacity

Leeds Station Capacity is the first project to be completed as part of the TRU programme. All TRU projects are ...
BREEAM-Infrastructure-sustainable-Bergen-Norway-underground-station-platforms

Bybanen D13 Haukeland Holdeplass

Bybanen D13 Haukeland Holdeplass is the very first underground station at the light rail system in Bergen, Norway.  It has ...
A77 Maybole bypass southern roundabout sustainable infrastructure

A77 Maybole Bypass Construction Award

The A77 Maybole Bypass reduces journey times on the A77 by diverting traffic away from the High Street of the ...
Drone Photo of new jetty at Thanckes Oil Fuel Depot

Thanckes Oil Fuel Depot Loading Facility & Tank Farm Fire Fighting Upgrade

VolkerStevin constructs a new jetty at Thanckes Oil Fuel Depot to provide fuelling facilities for the Royal Navy at Devonport ...

Get in touch

Contact us now or call us on +443330147880 if you would like to talk to our team about how CEEQUAL can support you.

Tags