Blue line to Barkarby | CEEQUAL

Blue line to Barkarby, FUT4, Extended Metro Administration, Region Stockholm

Blue line to Barkarby | CEEQUAL

CEEQUAL Excellent (78.2%) – Interim Client and Outline Design Award
 Version 5, April 2020 | Stockholm, Sweden

Client: Extended Metro Administration, Region Stockholm
Assessor:  Elin Ahlström, Tyréns
DesignersTyrénsRambollWhite Arkitekter

Blue line to Barkarby | CEEQUAL

Project Summary

Stockholm is one of the fastest growing metropolitan regions in Europe. The population is increasing by 35 ,000 a year which puts higher demands on more housing and better public transportation.

Already in the 2010 Regional development plan it was stated that the Stockholm region was very “one-cored” and needed to become more “multi-cored” to counteract the spread of buildings and activities from the central.

One of 8 prioritized cores were Barkarby-Jakobsberg and in the 2013 Stockholm negotiations it was decided to extend the current metro from Akalla to Barkarby with 4 km tracks and two new stations, one in the upcoming new town Barkarbystaden.

The metro is located below ground and will have entrances in ground level, mostly integrated in new buildings (to be built outside the project scope) and one separate entrance hall designed with meadow roof.

All platforms/ticket halls will be part of the Stockholm Metro Art exhibition and will have different features, where for example one of the platforms will have screens showing clouds and sky to resemblance the old military airport that was located above.

There will be one ventilation tower placed in a green field. This has been made in wood with integrated bird nests.

CEEQUAL’s Role

Challenges

There are two main challenges from an environmental point of view.

To perform the tunnelling with a minimum of impact on the groundwater levels and a minimum of noise disturbances for the people who lives and works nearby. Extensive grouting is required to prevent impact on groundwater levels. Infiltration wells are also prepared to refill the waterbeds.

To limit noise disturbances, noisy work will be carried out at special times. Furthermore, people who are permanently exposed to high noise levels will be offered temporary housing. Extensive information efforts will also be carried out to increase people’s acceptance to noisy work.

What were the drivers and perceived benefits for undertaking a CEEQUAL assessment on this project?

The clients aim was to be able to measure the sustainability level between the different metro extension projects and make them use the same framework for their design and provide a good basis for the construction stage. Also since CEEQUAL is still pretty new in Sweden it was considered to have a marketing value.

What elements of this project highlight best practice and innovation?

Project strategy (gamification strategy), integrated bird nest in the ventilation tower and a thorough work in early design stage with product choice to avoid hazardous materials.

 

Blue line to Barkarby | CEEQUAL

Achievements

Project Management

The client compiled guideline documents for how all metro extensions projects should work with sustainability. These were:

  • Instruction for resource efficiency and limited climate impact
  • Instruction for socially sustainable construction stage
  • Instruction for product and material choices
  • Instruction for CEEQUAL management
  • Instruction for carbon footprint calculations
  • Strategy for sustainability in the projects

 

To make it fun and inspiring to work with all these strategies, the project team worked with a gamification strategy where all designers from different aspects competed against each other, scoring points for working with sustainability. This led to a very engaged project team.

We also worked with monthly, voluntary workshops where everyone who wanted to work focused on their sustainability targets could join, instead of mandatory, separate meetings with each design leader.

People and Communities

In the project the client has from early planning stage throughout the design worked with several activities to involve the community. There have been several public meetings, open houses, digital surveys, attitude surveys etc.

When it comes to design one of the entrance halls has been designed with a meadow roof and the ventilation tower has been designed with integrated bird nests which enhance the recreational value. The platforms have also been designed as a part of the Stockholm Metro art exhibition which also make them feel safer for different groups.

A separate Social Impact Assessment has been conducted as well as studies about child perspective in the construction stage and Traffic Safety Analysis.

 

Blue line to Barkarby | CEEQUAL

 

Land Use and Landscape

Prior to choosing the location of the metro a location study was conducted, both for location of stations and location of the tracks. The aspects that were included in the study were:

  • Other projects in the area
  • Existing structures
  • Municipalities’ detailed development plan
  • Geological conditions
  • Track technical conditions
  • Availability/accessibility
  • Existing pipes and cables
  • Protected areas/national interests
  • Environmental conditions

 

The project is located partly in an urban area and partly on a field. The western part of the field will be developed to an urban area including the metro’s entrances, while the eastern part of the field, close to the creek, will be preserved as a nature reserve. Since the metro is located below ground with only one separate entrance hall (the rest integrated in buildings to be built) the impact on land use and landscape is relatively small.

During the construction stage, most of the areas used for establishment and temporary works has been chosen because they were already paved surfaces.

There are some contaminations that are being removed through the excavation and there are also some kerosene and PAH:s present that are been remediated on site.

 

Blue line to Barkarby | CEEQUAL

 

Ecology and Biodiversity

Two EIAs and several underlying studies have been conducted. A couple of protected species were found nearby the project site:

  • Eurasian skylark
  • Meadow pipit
  • Amphibians
  • Hepatica
  • Pasqueflower

 

Stone loach was also found in a nearby creek. However the species were found much further down the creek and stone loach is not protected, only uncommon.

Since most part of the project is located below ground, it will have very small impact on the ecology and no protective measures was deemed needed in the EIA:s other than measures to minimize the ground water lowering.

To compensate for the small areas that are being built above ground, the roof of the separate entrance hall is a meadow and the ventilation tower is made in wood as a big bird nest.

The Water Environment

To prevent the tunneling leads to a lowering of the ground water, protective measures will be taken. Grouting is done regularly during construction and there is also several infiltration equipment prepared to keep the ground water levels stable, both during construction and operation.

During construction stage there are very high demands of waste water treatment and control measures are in place. Both stormwater and water from the process are undergoing treatment before discharge.

During operation there will be a permanent water treatment plant in place for the drainage water. It is also prepared so that drainage water can be led to infiltration wells and be used as refill groundwater.

Since the project is below ground there are very little hard surfaces that lead to runoff and the only separate building will have a green meadow roof that can delay/retain runoff.

In the stations, water efficient faucets have been designed.

Physical Resources – Use and Management (Energy, Water, Materials, Waste)

Together with the municipality, the project signed a contract saying that if the municipality put a local rock crushing plant in the area, the project had to transport all their rock there and later re-buy from the same crushing plant to minimize transportation. The crushed material can also be used in the extensive exploitation in the local area.

In the project the construction material evaluation system Byggvarubedömningen has been used. The system evaluates specific products in three different levels (Avoid, Accepted, Recommended). The aspects evaluated for each product are among other aspects hazardous chemical components, percentage renewable content, percentage reused material, FSC/PEFC, emissions, percentage renewable energy during manufacturing, packaging method, VOC etc.

The project has also been designed with a long lifespan (120 years) to minimize waste during construction. Several energy saving designs has been made, such as placing platforms on a little “hill”, LED-lightning and energy efficient escalators/elevators.

The Historic Environment

There were some areas of archaeological value identified in the two EIAs. The projects localisation/stretch was then changed to avoid crossing these. Hence there has been no impact/very little impact in the historic environment from the project where it is located in a tunnel below ground. The ventilation tower has been made rounded in wood to better fit in the landscape.

The entrances will affect the feeling of the historic environment and landscape in the area, however the future development of the Barkarbystaden will affect it more which is outside the project scope.

Transport

The project itself is a transport project made to enable more sustainable transportation’s between Stockholm and Barkarby.

There have been transportation policies in place during design stage and we have followed up on them with a transportation survey with results showing that a lot of meetings were made over Skype and that most project members used bike, bus or metro to travel to their offices and between meetings.

In the design stage there has also been a separate Traffic Safety Analysis made for the construction stage and the local crushing plant reduces the length of the transportation’s.

Blue line to Barkarby | CEEQUAL

CEEQUAL insights and case studies

Browse the latest insights, thinking and case studies from CEEQUAL

 

Skonviksvagen-featured

Stockholm Metro Nacka project awarded Excellent

The Stockholm Metro Nacka Extension is awarded Excellent, showing Stockholm's commitment to sustainable urban development ...
breeam-infrastructure-stockholm-metro-extension-sofia

Stockholm Metro Sofia access tunnel a BREEAM Infrastructure success

BREEAM Infrastructure is helping Stockholm expand it's Metro to boost public transport and support sustainable urban growth ...
Stockholm Extended Metro access tunnel Sundstabacken achieves CEEQUAL Excellent rating

Stockholm Extended Metro access tunnel Sundstabacken achieves CEEQUAL Excellent rating

The Stockholm Metro extension aims to boost public transport capacity by growing the system. Building metro infrastructure in a dense ...
E08-Forberedende-arbeider-BREEAM Infrastructure

Preparatory works for the new water treatment system in Oslo achieves BREEAM Infrastructure Excellent rating

The preparatory works for the new water treatment system in Oslo, ordered by 2028 achieves BREEAM Infrastructure Excellent ...
Ramsdal bridge BREEAM Infrastructure

E39 Mandal øst – Mandal

E39 Mandal East- Mandal city consist of a 7 km long four lane highway that together with the new E39 ...
BREEAM Infrastructure Bybanen D18 Sykkelvei Kronstadtunnelen

Bybanen D18 Sykkelvei Kronstadtunnelen

Project D18 Sykkelvei Kronstadtunnelen is part of the Bybanen-light rail construction stage 4 development scheme. This is the largest development ...